CM Sloping terminated Vee CE ' SY len = 121.9 ' Wire length SY hgh = 15.24 ' Tower Height SY sup = 1.829 ' Support height SY alfa = 45 ' Angle between wires SY rad = 1e-03 ' Wire radius in feet ' SY dz = hgh-sup SY xylen = sqr(len*len-dz*dz) SY dx=xylen*sin(alfa/2), dy = xylen* cos(alfa/2) ' GW 1 80 -dx-.2 dy sup -.2 0 hgh rad GW 2 1 -.2 0 hgh .2 0 hgh rad GW 3 80 .2 0 hgh dx+.2 dy sup rad GW 11 3 -dx-.2 dy 0 -dx-.2 dy sup rad GW 31 3 dx+.2 dy 0 dx+.2 dy sup rad ' GE 1 GN 2 0 0 0 4 .001 ' EX 0 2 1 0 1 0 ' LD 5 1 0 0 5.8001E7 LD 5 3 0 0 5.8001E7 SY res=370 LD 0 11 2 0 res LD 0 31 2 0 res ' SY freq=7.05 FR 0 1 0 0 freq 1 EN